Tower cranes: how to reduce the failure of tower cranes

Tower cranes: how to reduce the failure of tower cranes

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2022-04-01
  • Views:0

(Summary description)The general working temperature of the tower crane is -20 ℃ ~ +40 ℃, the working wind speed is not greater than 6. Tower crane drivers and heavy lifters must be trained, and have a special machine induction certificate to operate. Operation of tower cranes must do "five good". Five good is: good concentration of thought; good up and down contact; machine inspection good; tighten the lift good; unified command good.

Tower cranes: how to reduce the failure of tower cranes

(Summary description)The general working temperature of the tower crane is -20 ℃ ~ +40 ℃, the working wind speed is not greater than 6. Tower crane drivers and heavy lifters must be trained, and have a special machine induction certificate to operate. Operation of tower cranes must do "five good". Five good is: good concentration of thought; good up and down contact; machine inspection good; tighten the lift good; unified command good.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2022-04-01
  • Views:0
Information

  Tower crane is also known as "tower crane". With a section of a section of the joint height (referred to as "standard section") used to hang construction of steel, wood flute, concrete, steel pipe and other construction materials.
Tower crane general working temperature of -20 ℃ ~ +40 ℃, working wind speed is not greater than 6. Tower crane drivers and heavy lifters must be trained, and have a special machine induction certificate to operate. Operation of tower cranes must do "five good". Five good is: good concentration of thought; up and down contact; machine inspection; tied to lift good; unified command good.

  Tower crane device four limits, two insurance shall be complete, sensitive, reliable. Tower crane in operation, if you hear an abnormal noise, should immediately stop, tower cranes after a good overhaul and then put into operation. To frequently check the wear and lubrication of the wire rope, if not meet the requirements to immediately replace.

  Before each operation of the tower crane, are to no-load test the switch contacts of the devices, and require in the correct position. Often check the tower crane tower verticality <3/1000. tower crane does not work, loosen the braking device of the slewing mechanism, the tower crane hook up to close to the jib, the hook is strictly prohibited to hang heavy objects, walking tower crane shall be the clamp rail clamp lost tight.

  Tower crane jacking plus section when the rotary brake should be in the braking state, such as feel unreliable can also add temporary fixed measures; tower crane jacking process, forbidden to rotate the boom or drive the load trolley and the use of lifting and lowering action.

Translated with www.DeepL.com/Translator (free version)

Scan the QR code to read on your phone

Related News

Contact Us

 

Add: Wenxing Road, Houcheng, Jingang Town, Zhangjiagang City, Jiangsu Province, China

Tel: 0512 58772872

Fax: +86-512-58773712

E-mail: 18551270106@163.com

这是描述信息

Follow us on public

Copyright © 2022   Zhangjiagang Fusan Construction Machinery Co.,Ltd.   SEO

苏ICP备16035907号-1    Technical Support: China Enterprise Power By:300.cn

浮山建机